Tel/WhatsApp
+8617205449934咨询电话HOTLINE
15762486900山东宇泽防水材料有限公司
地址:山东寿光市台头工业园
销售部电话:侯经理 15762486900
ShanDong yuze Waterproof materials Co., Ltd.
Wendy li:+8617205449934
whatsapp:+8617205449934
Address: Taitou Industrial Park, Shouguang City, Weifang City, Shandong Province
Tel/WhatsApp:+8617205449934
15762486900
山东宇泽防水材料有限公司
山东省潍坊市寿光市台头工业园
2020-12-16
8690

CPS防水卷材的应用领域:
1、各类地下工程的防水抗渗,如地下室、人防工程、地铁等防水工程;
2、工业与民用建筑的屋面及外墙防水;
3、地下车库顶板种植绿化与屋顶花园等工程的防水;
4、对潮气颇为敏感的粮库、电子车间等地的防潮; 施工方法 湿铺法:是指将用于非外露防水工程的湿铺防水卷材,用水泥凝胶(素水泥浆)与基层粘结的施工方法。适用于各类工业与民用建筑的屋面、地下室等防水工程,特别适用于防水等级较高、施工环境较差、潮湿、赶工期的防水工程。 根据工程结构、工程类别、工程设计、使用标准等不同要求可选用湿铺或预铺(隧道挂铺)
湿铺式:
1、基层处理:清理基层表面,基层可以潮湿,但不能有明水。如基层干燥需洒水湿润。
2、配制水泥素浆:在水泥(不低于32.5R级普硅盐水泥)当中直接加水,水泥:水=1:0.3~0.4(重量比,根据实际情况合理调查),用电动搅拌器搅拌1~2min,拌匀静置5~8min。
3、卷材粘贴:用刮板将拌制好的水泥素浆均匀地涂刮在基层上,边涂刮边将高分子复合自粘防水卷材铺贴在上面,并排气压实。
4、接缝粘贴:卷材接缝采用冷自粘方式。相邻短边接缝应错开1m以上;长边接缝施工时,撕去接缝自粘边的预留隔离带,对准粘贴标志线直接粘贴;然后用专用密封膏将加强密封收头处理。
施工注意事项:
1、拌制水泥砂浆素浆,注意水灰比,以免影响防水层粘接质量。
2、卷材接缝粘接前,避免有水泥砂浆污染搭接面,以接缝粘接。
3、卷材铺贴完工后48小时内不准踩踏或挠动已施工的防水层。如需马上进行下道工序施工时,应注意对防水层的保护。
预铺式(挂铺式):
1、卷材预铺:将产品量好裁切,将卷材的自粘层隔离纸面朝向结构层,另一面朝向基层,预先铺设在垫层、保护墙、地下连续墙或排桩上。(暗挖隧道采用带土工布表面材料的高分子卷材直接挂在预先固定的挂钩上)
2、卷材接缝:卷材接缝采用冷自粘方式,撕去接缝自粘边的预留隔离带直接粘贴即可,形成完整密封的防水系统。
3、卷材反粘:撕去隔离纸,浇筑结构混凝土,卷材能与流动的混凝土相互交联啮合,形成强大的粘接力。这样卷材就粘结到混凝土建筑结构上,从而形成防水卷材与建筑结构刚柔无间隙结合。
4、如需绑扎钢筋,揭去隔离纸直接绑扎即可,再为防水卷材浇筑砂浆细石混凝土做保护层。
施工注意事项:
1、施工人员应穿无钉鞋或胶底鞋,禁止在卷材上任意踩踏。
2、揭去隔离纸后,应在卷材上轻撒干水泥粉或砂粉,便于施工。
3、接缝施工后,应对卷材接缝进行检查,如发现有破损处应及时处理。
4、绑扎钢筋或浇筑混凝土时,应注意对防水层的保护。
包装、贮存与运输:
1、专用塑料包装袋密封包装,在干燥、通风环境下贮存,防止日晒雨淋;
2、不同类别、规格卷材应分别堆放,不应倾斜或交叉横压;
3、卷材平放,堆放高度不超过五层;
4、贮存温度不超过45℃。
Application Fields of CPS Waterproofing Membrane
1. Waterproofing and anti-seepage of various underground works, such as basements, civil air defense works and subways;
2. Roof and exterior wall waterproofing of industrial and civil buildings;
3. Waterproofing of planted greening on underground garage roofs and roof gardens;
4. Damp-proofing of places sensitive to moisture such as grain depots and electronics workshops.
Construction Method – Wet-Laid Method: a wet-laid waterproofing membrane for non-exposed waterproofing works is bonded to the substrate with cement gel (plain cement slurry). It is suitable for waterproofing works such as roofs and basements of various industrial and civil buildings, and especially for works with a high waterproofing grade, poor construction conditions, damp conditions and tight schedules. Depending on the engineering structure, category, design and applicable standards, either wet-laid or pre-laid (tunnel hanging) installation may be selected.
Wet-Laid Type
1. Substrate preparation: clean the substrate surface. The substrate may be damp but must have no visible water. If the substrate is dry, sprinkle water to moisten it.
2. Preparing cement slurry: add water directly to cement (not lower than grade 32.5R ordinary Portland cement), cement:water = 1:0.3–0.4 (by weight, adjusted reasonably according to actual conditions), stir with an electric mixer for 1–2 min, mix well and let stand for 5–8 min.
3. Membrane bonding: use a scraper to spread the prepared cement slurry evenly on the substrate, and while spreading, lay the polymer composite self-adhesive waterproofing membrane onto it, expelling air and compacting.
4. Seam bonding: membrane seams use the cold self-adhesive method. Adjacent short-side seams shall be staggered by more than 1 m; for long-side seams, remove the reserved release strip on the self-adhesive edge, align with the bonding mark line and bond directly, then seal the termination with special sealant.
Construction Precautions
1. When mixing cement mortar slurry, pay attention to the water-cement ratio so as not to affect the bonding quality of the waterproofing layer.
2. Before bonding membrane seams, avoid contamination of the lap surface by cement mortar to ensure the seam bonding effect.
3. Within 48 hours after the membrane is laid, stepping on or disturbing the completed waterproofing layer is not allowed. If the next process must proceed immediately, pay attention to protecting the waterproofing layer.
Pre-Laid Type (Hanging Type)
1. Membrane pre-laying: measure and cut the product; place the membrane with the release paper side of the self-adhesive layer facing the structural layer and the other side facing the substrate, pre-laying it on the cushion, protection wall, diaphragm wall or row piles. (For bored tunnels, polymer membrane with a non-woven surface material is hung directly on pre-fixed hooks.)
2. Membrane seams: seams use the cold self-adhesive method; simply remove the reserved release strip on the self-adhesive edge of the seam and bond directly, forming a complete sealed waterproofing system.
3. Reverse bonding: remove the release paper and pour structural concrete; the membrane and the flowing concrete interlock and mesh with each other, forming strong bonding force. The membrane is thus bonded to the concrete structure, forming a rigid-flexible, gap-free combination of waterproofing membrane and building structure.
4. If reinforcement is to be tied, simply remove the release paper and tie directly; there is no need to pour mortar or fine aggregate concrete as a protection layer for the membrane.
Construction Precautions
1. Workers shall wear nail-free shoes or rubber-soled shoes; walking on the membrane at will is prohibited.
2. After removing the release paper, lightly sprinkle dry cement powder or sand powder on the membrane to facilitate construction.
3. After seam construction, inspect the membrane seams and deal promptly with any damage found.
4. When tying reinforcement or pouring concrete, pay attention to protecting the waterproofing layer.
Packaging, Storage and Transport
1. Sealed in special plastic packaging bags, stored in a dry, ventilated environment, protected from sunlight and rain;
2. Membranes of different categories and specifications shall be stacked separately, not tilted or cross-stacked under horizontal pressure;
3. Membranes shall be laid flat, stacked no more than five layers high;
4. Storage temperature shall not exceed 45°C.